Why in News

Recently,  National Thermal Power Corporation Limited (NTPC) Renewable Energy Ltd ( REL ) signed a Memorandum of Understanding with the Union Territory of Ladakh to set up the country’s first  Green Hydrogen  Mobility project.

§  NTPC REL will also set up a solar park at Rann of Kutch in Gujarat from where it will also generate green hydrogen on a commercial scale under the Ultra-Mega Renewable Energy Power Parks (UMREPP) scheme.





o    Hydrogen produced from renewable sources is called green hydrogen.

Ultra-Mega Renewable Energy Power Parks (UMREPP) scheme

§  It is a scheme to develop Ultra Mega Renewable Energy Power Parks (UMREPPs) under the existing Solar Park Scheme.

o    The scheme was rolled out by the Ministry of New & Renewable Energy (MNRE) in 2014.

 

o    Solar Park Scheme is also a scheme of MNRE to set up a number of solar parks across various states in the country. It proposes to provide financial support by the Government of India to establish solar parks.

 

 

§  The objective of the UMREPP is to provide land upfront to the project developer and facilitate transmission infrastructure for developing Renewable Energy (RE) based Power Parks with solar/wind/hybrid and also with storage systems.

Key Points

§  Green Hydrogen Mobility Project:

o    NTPC REL has planned to ply 5 hydrogen buses, to start with, in the region and the company will be setting up a solar plant and a green hydrogen generation unit in Leh towards this end.

o    This will put Leh as the first city in the country to implement a green hydrogen based mobility project. This would be zero emission mobility in true sense.

o    This is also in line with the Prime Minister’s vision of a ‘carbon neutral’ Ladakh.

o    It will help Ladakh develop a carbon free economy based on renewable sources and green hydrogen.

§  India’s Largest Solar Park:

o    NTPC REL will set up a 4.75 gigawatt (GW) renewable energy park at Rann of Kutch in Khavada, Gujarat. This will be India’s largest solar park to be built by the largest power producer of the country.

·         Kutch region in Gujarat, the largest salt desert in the country and host to two of India’s largest coal-fired power plants, will now add another feather to its cap.

§  Other Major Projects of NTPC:

o    Recently, NTPC has also commissioned India’s largest Floating Solar of 10 MW (ac) on the reservoir of Simhadri Thermal Power Plant, Andhra Pradesh. An additional 15 MW (ac) would be commissioned by August 2021.

o    Further, a 100 MW Floating Solar Project on the reservoir of Ramagundam Thermal Power Plant, Telangana is in the advanced stage of implementation.

§  Other Solar Energy Initiatives:

o    National Solar Mission : Solar energy has taken a central place in India's National Action Plan on Climate Change with the National Solar Mission as one of the key Missions.

o    INDC’s target: It targets installing 100 GW grid-connected solar power plants by the year 2022.

·         This is in line with India’s Intended Nationally Determined Contributions (INDCs) target to achieve about 40% cumulative electric power installed capacity from non-fossil fuel based energy resources and to reduce the emission intensity of its GDP by 33 to 35% from 2005 level by 2030.

o    Launch of ISA: The launch of the International Solar Alliance (ISA) was announced by the Prime Minister of India and the President of France in 2015, at the 21st session of the United Nations Climate Change Conference of the Parties (COP-21) in Paris, France.

o    Government Schemes: Such as Solar Park Scheme, Canal bank & Canal top Scheme, Bundling Scheme, Grid Connected Solar Rooftop Scheme etc.

o    One Sun One World One Grid: India has an ambitious cross-border power grid plan ‘One Sun One World One Grid’ that seeks to transfer solar power generated in one region to feed the electricity demands of others.

National Thermal Power Corporation Limited

§  NTPC Ltd. is a central Public Sector Undertaking (PSU) under the Ministry of Power.

o    NTPC REL is a 100% subsidiary of NTPC.

§  It is India’s largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India.

§  It aims to provide reliable power and related solutions in an economical, efficient and environment-friendly manner, driven by innovation and agility.

o    NTPC has also been promoting usage of green hydrogen based solutions in sectors like mobility, energy, chemical, fertilizer, steel etc.

§  It became a Maharatna company in May 2010.

§  It is located in New Delhi.

 

Primary Distribution Design - Types And Advantages

  Primary Distribution Design - Types And Advantages Primary Distribution Design - Types And Advantages Primary distribution design is a pro...
Challenges And Issues Related To Interconnection

Challenges And Issues Related To Interconnection

Challenges And Issues Related To Interconnection   Challenges And Issues Related To Interconnection Challenges and Issues related to Interco...

Interconnection Issues With Wind Power Generation

Interconnection Issues With Wind Power Generation

  Interconnection Issues With Wind Power Generation   Interconnection Issues With Wind Energy Generation Wind turbines can be connected to a...
Load Forecasting And Methods Of Load Forecasting

Load Forecasting And Methods Of Load Forecasting

  Load Forecasting And Methods Of Load Forecasting Load Forecasting And Methods Of Load Forecasting The load forecasting is method used to p...
Main Consideration In The Mechanical Design Of Transmission Lines

Main Consideration In The Mechanical Design Of Transmission Lines

  Main Consideration In The Mechanical Design Of Transmission Lines Main Consideration in the Mechanical Design of Transmission Lines Overhe...
Distribution System Planning

Distribution System Planning

  Distribution System Planning Purpose Of Distribution System Planning 1. Network extension to meet customer demand 2. To satisfy supply per...
Generation Planning Types

Generation Planning Types

  Generation Planning  Types Generation planning is divided / classified  into various types depending on time scales one day ahead one weak...

Power System Over Voltages

  Power System Over Voltages Power System Over Voltages Power System Over voltages Over voltages:  These are generated due to : Fault Load r...
Total And Reactive Load Forecasting

Total And Reactive Load Forecasting

  Total And Reactive Load Forecasting Total And Reactive Load Forecasting 1. Total Load Forecasting For total load forecast both weather sen...
Balancing And Frequency Control

Balancing And Frequency Control

  Balancing And Frequency Control Balancing And Frequency Control Frequency is maintained in an interconnection as long there is a balance b...
Different Tests On Induction Motors

Different Tests On Induction Motors

  Different Tests On Induction Motors Tests On Induction Motors Hello All Welcome back to our blog World Of Electrical Engineering. Today we...
Installation Handling Of Transformer

Installation Handling Of Transformer

  Installation Handling Of Transformer Installation Handling Of Transformer Hello All, Welcome back to our blog Electrical Online 360°. Toda...
Nature Of Engineering Economics

Nature Of Engineering Economics

  Nature Of Engineering Economics Nature Of Engineering Economics Again considering the definition, economics has to deal with the limited r...
Function And Necessity Of A.C. Starters

Function And Necessity Of A.C. Starters

  Function And Necessity Of A.C. Starters Function Of Starter Why we use Starter in Induction Motors? The device which is used to start the ...
D.O.L ( Direct Online Starter ) - Definition And Working

D.O.L ( Direct Online Starter ) - Definition And Working

  D.O.L ( Direct Online Starter ) - Definition And Working D.O.L ( Direct Online Starter ) - Definition And Working Definition Of D.O.L (Dir...
How Harmonic Analyzers And Spectrum Analyzers Works?

How Harmonic Analyzers And Spectrum Analyzers Works?

  How Harmonic Analyzers And Spectrum Analyzers Works? 1. Harmonic Analyzers And Spectrum Analyzers How Harmonic Analyzers And Spectrum Anal...

click read PRESENT TENSE


यदि आप पिछले या फिर Next --- Daily use English Sentence बाले पोस्ट को पढना चाहते हैं, तो नीचे दिए गए link पर click करके पढें ।

simple-present-indefinite-tense-hindi

click read PRESENT TENSE


Related Posts



यदि आप पिछले या फिर Next बताए गए Chapter वाले पोस्ट को पढना चाहते हैं तो नीचे link दिए गए हैं । उसपर click करके पढ सकते हैं ।

Use of Am/Is/Are


Use of Was/Were


Use of Shall be & Will be


Use of This, That, These, Those


Use of Possessive Adjectives


अब मै आशा करता हूँ कि आप बताए गए सभी Points को अच्छे से समझ गए होंगें । यदि फिर भी कोई points समझ मे नहीं आया हो । तो आप "Comment" करके हमसे पूछ सकते हैं ।

आपको यह पोस्ट कैसा लगा हमें नीचे "Comment" करके अवश्य बताएं और यदि इस पोस्ट मे कोई कमी हो तो उसे भी Comment मे लिखें और यदि आपको यह पोस्ट helpful लगा हो, तो अपने friends और दूसरे Students के साथ Share अवश्य करें । ताकि वो सब भी इस पोस्ट को पढकर सीख सकें ।


यदि आप पिछले या फिर Next --- Daily use English Sentence बाले पोस्ट को पढना चाहते हैं, तो नीचे दिए गए link पर click करके पढें ।

You are reading the newest post


Newest
You are reading the newest post

Newest
You are reading the newest post












Post a Comment

0 Comments